Thursday 12 March 2009

[week 6] making rib variants

Material preparation
For building the variants some materials were collected. Also cutting big boards and milling the profiles needed some preparation. Below are some pictures of preparation of the materials.



Figures sizing and milling variant 1.


Figures milling variant 2.

Figure fitting variant 3.

This all came together with 12 students building the three different variants.


Figure drilling holes in variant 1.


Figure making sparings in variant 2.


Figure fitting web in flanges in variant 3.

No comments:

Post a Comment